MUIRNet-News Home Report and Publication Download States California PROJECT SOURCES OF SEDIMENT TECHNICAL REPORT




MUIRNet Resources Directory

PROJECT SOURCES OF SEDIMENT TECHNICAL REPORT

PG&E - SMUD

PROJECT SOURCES OF SEDIMENT TECHNICAL REPORT

This technical report provides the results of surveys for project sources of sediment on SMUD’s Upper American River Project. Engineering staff from Devine Tarbell & Associates, Inc. along with SMUD staff (to locate roads to be surveyed) conducted the survey. The survey included driving or walking along all roads indicated to be surveyed on the master list and identifying erosion or sediment that had the potential to reach a watercourse. When potential problems were observed, a closer observation was conducted by walking the road area and taking photos to document the problem area.

 

 


Date added: 2009-12-26 22:22:44    Hits: 5
Powered by Sigsiu.NET RSS Feeds
Joomla SEF URLs by Artio
VALID CSS   |   VALID XHTML